The roof sheathing and a majority of the membrane roofing has been installed. The window openings have been covered to allow some interior work to proceed.
December 4, 2019
The roof sheathing and a majority of the membrane roofing has been installed. The window openings have been covered to allow some interior work to proceed.
December 4, 2019