During January, the window installer began installing clips for the windows. The work was accessed from the interior to avoid working within the overhead power line unsafe zone. The contractor is still trying to strategize how to safely install the large glass panels without exposing workers to the high voltage line(s). The goal is to try and climatize the building as soon as possible so the installation of interior finishes can be started with minimum delay.
February 3, 2020
During January, the window installer began installing clips for the windows. The work was accessed from the interior to avoid working within the overhead power line unsafe zone. The contractor is still trying to strategize how to safely install the large glass panels without exposing workers to the high voltage line(s). The goal is to try and climatize the building as soon as possible so the installation of interior finishes can be started with minimum delay.
February 3, 2020