Underlayment was installed for the tile on the exterior walls of the community room and children’s wing. Grading is underway in preparation of the installation of the exterior deck/porch outside the children’s wing.
March 3rd, 2020
Underlayment was installed for the tile on the exterior walls of the community room and children’s wing. Grading is underway in preparation of the installation of the exterior deck/porch outside the children’s wing.
March 3rd, 2020