The structural steel to support the overhead was installed on the south (Clares Street) elevation. The addition of structural steel is required to allow the installation of the roof overhang to continue to the point where the existing power lines impacts the work.
June 10, 2020
The structural steel to support the overhead was installed on the south (Clares Street) elevation. The addition of structural steel is required to allow the installation of the roof overhang to continue to the point where the existing power lines impacts the work.
June 10, 2020